How to respond to a government RFQ for IT products: a go/no-go checklist
Short answer
Before you price anything, check four things. You're registered in SAM. The set-aside fits your business. The deadline leaves time for a supplier quote. You can get the product and you're allowed to sell it. If any answer is no, pass. If all four are yes, read the attachments and work through the rest of the list below.
The four stops
Each of these can end the bid on its own. Check them first, because they take minutes and pricing takes hours.
- You're registered in SAM. The FAR says "Offerors and quoters are required to be registered in SAM at the time an offer or quotation is submitted," with a few exceptions (FAR 4.1102(a)). If your registration has lapsed, fix that before anything else.
- The set-aside fits you. A notice with no set-aside is open to any registered business. A small-business set-aside needs you to be small under the size standard the notice names. 8(a), HUBZone, service-disabled veteran-owned and women-owned set-asides need that status too.
- The deadline leaves time for a supplier quote. Read the time zone, which is often the buying office's local time. When a notice uses the FAR's standard instructions for commercial buys, a late offer "will not be considered" except in narrow cases (FAR 52.212-1(f)).
- You can get it, and you're allowed to sell it. Some notices only accept quotes from the maker's authorized resellers or ask for a letter from the maker. Our guide to brand name or equal covers that check.
Before you price it
If the four stops pass, these decide whether the bid is worth pricing.
- What exactly they want. The notice text is often a summary. The quantities, specs and delivery terms usually sit in the attachments. If it says "or equal," the listed characteristics are the real spec.
- Trade agreement rules. Trade agreement rules can decide which products you may offer. For supply buys, the WTO trade agreement threshold is $174,000 (FAR 25.402(b)). Check country of origin with your distributor before you quote, not after.
- The nonmanufacturer rule, if it applies. It applies to small-business set-asides above the simplified acquisition threshold, and to 8(a), HUBZone, service-disabled veteran-owned and women-owned set-asides at any value (FAR 19.505(a)). When it applies, a reseller must "Provide an end item that a small business has manufactured, processed, or produced in the United States" (FAR 19.505(c)(1)(i)). SBA can waive this for some products (FAR 19.505(c)(4)).
- The telecom question. You'll state whether you will or won't "provide covered telecommunications equipment or services to the Government" (FAR 52.204-24(d)). Know what's in the box before you sign that.
- Delivery. Where it goes and by when. An overseas address or a short delivery window can cost more than your margin.
- Cash. The government's payment is due on the later of "The 30th day after the designated billing office receives a proper invoice" and the 30th day after it accepts the goods (FAR 32.904(b)). Your distributor may want paying sooner.
One real bid, checked
Here's a bid from our digest of November 13, 2026. The U.S. Embassy in Guatemala City posted a solicitation for 600 tablets "similar or equal to Samsung Galaxy 11A+," plus 600 protective cases and cube chargers.
| Check | What the notice says | What it means for you |
|---|---|---|
| Set-aside | None. | Open to any registered business. |
| Deadline | November 25, 5:00 pm Central, which is 6:00 pm Eastern. | Twelve days from our digest. Check the time zone before you plan backward from it. |
| Product | "Similar or equal" to one named tablet. | The required characteristics are the spec. Look for them in the attachments. |
| Delivery | Guatemala. | Get a shipping and customs quote early. It may decide the bid. |
None of those answers ends the bid by itself. The delivery line is the one most likely to.
The digest starts this list for you
Each bid in the daily email shows the set-aside, the due date with the days left and a 0 to 10 score. It adds a red flag when a notice allows one brand only, or only the maker's authorized distributors. The rest of the checklist is still yours.
Sources
- FAR 4.1102(a), 19.505, 25.402(b), 32.904(b), 52.204-24(d) and 52.212-1(f), acquisition.gov/far, read November 18, 2026 (FAC 2026-01).
- The example: the solicitation as posted on SAM.gov, November 3, 2026, and our digest of November 13, 2026.
- Related guides: Which SAM.gov notices should an IT reseller answer? and Brand name or equal: what can an IT reseller quote?
This guide explains public rules. It isn't legal advice, and nothing here means you'll win a bid.